Project Links
Sequoia and Kings Canyon National Parks » Rehabilitate 15.29 Miles of the Mineral King Road in Sequoia National Park » Document List » Document Contents
Categorical Exclusion and Response to Public Comments
This document includes a final description of the proposed action, components of the Sequoia Mitigation Plan, an environmental screen form with anticipated impacts, and the categorical exclusion form with all identified mitigations for project completion. This also includes the NPS response to public comments from the public scoping completed in Spring 2021.
Document Content: |
20220628_MKRR_Response to Public Comments.pdf
(213.1 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |