Project Links
Big Thicket National Preserve » Peoples Energy Production Vastar Unit 2A Well No. 2 Application for Exemption » Document List » Document Contents
Finding of No Significant Impact for Peoples Energy Production - Texas, LP Proposal to Directionally Drill and Produce the Vastar Unit 2A No. 2 Well from a Surface Location Outside the Beaumont Unit Big Thicket National Preserve Hardin and Orange Counties, Texas
FONSI signed by acting Intermountain Regional Director Michael D. Snyder on November 10, 2005.
![]() |
Document Content: |
FONSI Peoples Energy Production's Vastar Unit 2A No. 2 Well
(433.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |