PUHE Self Evaluation Transition Plan (SETP)


Pu'ukohola Heiau National Historical Site Accessibility Self Evaluation and Transition Plan (SETP) includes findings from the self-evaluation process, as well as a plan for improving accessibility parkwide. The SETP resulted from the work of a National Park Service (NPS) interdisciplinary design team, including planning, design, and construction professionals; and interpretive, resource, visitor safety, maintenance, and accessibility specialists.
 
Comment Period: Closed        Sep 15, 2023 - Dec 22, 2023
Document Content:
PUHE SETP_6C_Public.pdf   (3.4 MB, PDF file)
PUHE_SETP_IST_6E Public 4.xlsx   (80.5 KB, .xlsx file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.