Project Links
George Washington Memorial Parkway » Rehabilitate Clara Barton National Historic Site » Document List » Document Contents
January 2024 - Assessment of Effect Report
Final assessment of effects report for review and comment.
Comment Period:
Closed
Jan 9, 2024 - Feb 24, 2024
|
Document Content: |
CLBA 312325 AOE Final Report 121923_R2.pdf
(27.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |