Project Links
Wind Cave National Park » Project to Replace the Failing Wastewater Treatment Facility » Document List » Document Contents
Final Environmental Assessment, December 2005
The primary purposes of the project are compliance with state regulations by eliminating
surface discharge of wastewater and protection of park resources.
![]() |
Document Content: |
Final Environmental Assessment, December 2005
(2.1 MB, PDF file)
AMENDED FINDING OF NO SIGNIFICANT IMPACT
(250.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |