PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Mori Point Restoration and Trail Plan EA


The National Park Service (NPS) has prepared an Environmental Assessment (EA) that describes and analyzes alternatives for habitat restoration and development of a safe and sustainable trail system at Mori Point, a unit of the Golden Gate National Recreation Area (GGNRA) in Pacifica, CA. The EA presents and analyzes one No Action and three Action Alternatives. The Action Alternatives each contain a restoration, trail alignment, and trail use designation component.

Comments on the EA are due on March 31, 2006.
 
Comment Period: Closed        Feb 23, 2006 - Mar 31, 2006
Document Content:
Summary   (22.4 KB, PDF file)
Table of Contents   (97.9 KB, PDF file)
Chapter 1: Purpose and Need   (118.9 KB, PDF file)
Chapter 2: Description of Alternatives   (992.0 KB, PDF file)
Appendix D: Proposed Pond Locations   (1.8 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.