Final EIS, Burr Trail Road Modifications


Final Environmental Impact Statement for Burr Trail Road Modifications, Capitol Reef NP, Utah
 
Comment Period: Closed        Jun 15, 2006 - Aug 15, 2006
Document Content:
Cover through Affected Environment   (4.8 MB, PDF file)
Appendix D through end   (3.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.