Project Links
George Washington Memorial Parkway » MS4 Virginia » Document List » Document Contents
MS4 VA 2025 Annual Report
Annual MS4 permit reporting documents - This Fiscal Year 2025 (FY25) MS4 General Permit Annual Report has been prepared by the George Washington Memorial Parkway (GWMP) in accordance with General VPDES (Virginia Pollutant Discharge Elimination System) Permit for Discharges of Stormwater from Small Municipal Separate Storm Sewer Systems (9VAC25-890-40 et seq.). The Virginia Department of Environmental Quality (DEQ) issued the most recent permit (VAR040111) effective November 1, 2023.
|
Comment Period:
Closed
May 14, 2026 - May 28, 2026
|
| Document Content: |
|
GWMP MS4_FY2025 Annual Report_Virginia_20260430_signed.pdf
(453.3 KB, PDF file)
GWMP MS4 VA Appendices FY2025.pdf
(846.8 KB, PDF file)
GWMP Dry Weather Inspection Form.pdf
(50.5 KB, PDF file)
Phase II MS4 Permit.pdf
(163.2 KB, PDF file)
Final Comprehensive Local TMDL Action Plan_20260430_Section 508_signed.pdf
(1.8 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |
