Project Links
Comment period closes
May 19, 2026
at 11:59 PM Mountain Time in
Days, Hours, Min.
May 19, 2026
at 11:59 PM Mountain Time in
Days, Hours, Min.
Cedar Creek & Belle Grove National Historical Park » Document Bowman-Hite with a Cultural Landscape Report » Document List » Document Contents
Preliminary Public Listening Session & Stakeholder Questions
Public input is an important part of this process. People experience and value this
landscape in different ways, and those perspectives can help inform future decisions. By
sharing your knowledge, experiences, and/or concerns, you can help ensure that the
landscape reflects a wide range of stories and remains meaningful to both the history of
this area and the present-day communities that exist here.
We invite stakeholders to attend the event on May 5, or share input virtually. You can view the project study area map below and respond to topic questions.
|
Comment Period:
In Review
Apr 17, 2026 - May 19, 2026
Comment period closes
May 19, 2026 at 11:59 PM Mountain Time
in:
Days, Hours, Min. |
| Topic Questions: |
|
1. What elements or features of the landscape do you notice most when you are on- site, passing by, or thinking about this place? |
| 2. How would you describe your connection to, or familiarity with, the Bowman-Hite Farm and surrounding landscape? |
|
3. What factors, if any, influence your experience of the landscape (for example, physical features, access, or surrounding conditions)? |
| 4. Are there particular areas of the site that are meaningful to you? If so, in what way? |
| 5. How do you think different historical periods or historical uses of the site are currently represented? Are there any histories that you associate with the landscape, but think are under-represented at present? |
| 6. From your perspective, how is the landscape currently used or managed? |
|
7. Are there any changes to the landscape that you have noticed over time? |
| 8. Is there anything else you would like to share about this landscape or its future? |
| Document Content: |
|
2026-05-05_Bowman Hite Preliminary Workshop_Study Area Ownership Map.pdf
(12.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |
