Visitor Education and Research/Museum Facility Environmental Assessment


Florissant Fossil Beds National Monument (Monument) proposes to construct a new visitor education and research/museum facility near the farmhouse which currently serves as the Monument's interim visitor center.

This Environmental Assessment evaluates two alternatives; a no-action alternative and an action alternative. The no-action alternative describes the current conditions if no visitor education and research/museum building were constructed, while the action alternative addresses the removal of two existing buildings and construction of the new visitor education and research/museum building in roughly the same area as the farmhouse/interim visitor center. The action alternative also addresses the use of a temporary visitor center building during construction of the new building, as well as other connected actions such as building demolition, relocating and/or installing utilities (electric, water, sewer, etc.), landscaping and disturbed site restoration, and site work.
 
Comment Period: Closed        Aug 27, 2007 - Sep 28, 2007
Document Content:
FLFO VC EA   (11.7 MB, Word file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.