PEPC and Parkplanning will be offline Monday, May 20th, from 8 PM to 10 PM MT, and Tuesday, May 21st, from 8 PM to 10 PM MT for database maintenance.

Final National Historic Trail Feasibility Study Amendment and EA for Trail of Tears National Historic Trail Additional Routes


Final feasibility study/EA for Trail of Tears additional routes and maps
 
Document Content:
Context Map   (196.6 KB, PDF file)
Section Map 1   (457.4 KB, PDF file)
Section Map 2   (316.0 KB, PDF file)
Section Map 3   (334.3 KB, PDF file)
Section Map 4   (226.4 KB, PDF file)
Section Map 5   (275.6 KB, PDF file)
Section Map 6   (228.1 KB, PDF file)
Section Map 7   (319.7 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.