PEPC and Parkplanning will be offline Monday, May 20th, from 8 PM to midnight MT, and Tuesday, May 21st, from 8 PM to midnight MT for network maintenance.

Categorical Exclusion to Replace 7 Gas_Diesel Fuel Systems Parkwide


Replace 7 existing Gas/Diesel Fuel Systems located at Big Spring, Alley Spring, Round Spring, Akers, Pulltite, Shawnee Shop and Powdermill areas. The new equipment will be multiple double-walled concrete ASTs with interstitial monitoring systems, electronic inventory control measures and audible overfill alarms. All new fuel systems will be replaced on the existing footprint, with the exception of Big Springs, which will be relocated close to the Old Fire Cache within the Big Springs developed area.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.