Site 303 Soils Testing EA for public review


This EA analyzes the potential effects of NPS permitting geotechnical test boring at the Senita Basin tower #303. Drilling is needed to test soild stability for a possible 120' tower. There is a need for additional geotechnical data to properly design the tower and balast to meet all design and safety requirements. If permitted, a DHS contractor would drill three test holes six inches in diameter. Depths could range from 46-60 feet.
 
Comment Period: Closed        Jul 10, 2009 - Aug 10, 2009
Document Content:
SBInet Tower 303 Soils Testing EA   (4.3 MB, .doc file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.