PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Repair Lehman Creek Trail


Repair 3.2 miles of the Lehman Creek Trail from the Upper Lehman Creek trailhead to the trailhead at Wheeler Peak Campground.
 
Comment Period: Closed        Jun 13, 2011 - Jun 19, 2011
Document Content:
Repair Lehman Creek Trail   (44.4 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.