PEPC and Parkplanning will be offline Monday, May 20th, from 8 PM to midnight MT, and Tuesday, May 21st, from 8 PM to midnight MT for network maintenance.

FONSI


This is a Finding of No Significant Impact (FONSI) for the installation of regenerative stormwater conveyances at Milkhouse Run and Bingham Run.
 
Document Content:
FONSI   (834.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.