Project Links
Anacostia Park » Prepare and Initiate Wetland Management Plan & EIS (w/ Resident Goose Mgmt. Strategies) » Document List » Document Contents
Draft EIS
Draft Anacostia Park Wetland and Resident Goose Management Plan and Draft Environmental Impact Statement (DEIS) available for public review.
Comment Period:
Closed
Jul 21, 2011 - Sep 26, 2011
|
Document Content: |
Chapter 1
(4.9 MB, PDF file)
Chapter 2 Part 1
(1.2 MB, PDF file)
Chapter 2 Part 2
(5.2 MB, PDF file)
Chapter 2 Part 3
(5.2 MB, PDF file)
Chapter 2 Part 4
(5.4 MB, PDF file)
Chapter 3 Part 1
(4.2 MB, PDF file)
Chapter 3 Part 2
(3.9 MB, PDF file)
Chapters 4 and 5
(570.0 KB, PDF file)
Appendix A Part 1
(4.1 MB, PDF file)
Appendix A Part 2
(5.0 MB, PDF file)
Appendix A Part 3
(2.1 MB, PDF file)
Appendixes B, C , D and E
(2.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |