PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Public Scoping Comment Summary


This Public Scoping Comment Summary presents a summary of the comments received during the public scoping period, June 1, 2012 through July 31, 2012, for the Alcatraz Ferry Embarkation EIS. While not all comments received during public scoping are included in this report, all comments will be considered by NPS in preparation of the EIS.
 
Document Content:
Public Scoping Comment Summary   (124.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.