Project Links
Joshua Tree National Park » Eagle Mountain Boundary Study including Possible Land Withdrawal Environmental Assessment » Document List » Document Contents
Public Review, Eagle Mountain Boundary Study Newsletter 2
This newsletter provides an overview of the boundary study findings and a summary of the environmental assessment.
Document Content: |
JOTR_EM_EA_Review_Newsletter2_March2016_PEPC1.pdf
(3.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |