Finding of No Significant Impact Elkmont WWTP Upgrade


The Acting Regional Director, Southeast Region, National Park Service signed a Finding of No Significant Impact for the Elkmont Wastewater Treatment Plant Upgrade on June 28, 2018. Alternative C (Proposed Action and Preferred Alternative) - Upgrade WWTP and install subsurface effluent dispersal system was the selected alternative.
 
Document Content:
GRSM ElkmontWWTP FONSI Signed.pdf   (864.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.