PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Replace the Big Oak Flat Welcome Center Complex Environmental Assessment


The environmental assessment presents a preferred alternative that proposes to construct a new welcome center to unify visitor services, a new adequately sized comfort station, and a plaza to house informational/orientation panels to replace the existing welcome center complex facilities. It also propose reconfiguring the existing parking lot to decrease vehicle-pedestrian conflicts and reduce congestion and an unpaved staff parking area along Tuolumne Grove Road to reduce congestion. It would install a sewer to connect the welcome center complex to the Hodgdon community septic system and decommission the aging septic system currently serving the facilities. In addition, the action alternative would provide the option for the addition of a water tank and access road at a later date.
 
Comment Period: Closed        Nov 21, 2018 - Dec 20, 2018
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.