PEPC and Parkplanning will be offline Monday, May 20th, from 8 PM to midnight MT, and Tuesday, May 21st, from 8 PM to midnight MT for network maintenance.

Gulf Coast Site Plan and Maintenance Dredging Environmental Assessment


Environmental Assessment evaluates the effects of providing a new visitor center, dredge the marina boat basin and boat channels and increase infrastructure resiliency on site as a result of Hurricane Irma (2017) and Hurricane Ian (2022) and as presented in the 2015 General Management Plan/East Everglades Wilderness Study.
 
Comment Period: Closed        Jan 24, 2023 - Feb 26, 2023
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.