Lassen Volcanic National Park - All Documents and Projects

Pacific West » California

Listed in the table below are plans or projects and associated documents that have been posted to the public for the selected NPS unit. Click on the project title for more information on the whole project or on the document title for information on the specific document.

For general information, use the 'Park/Unit Information' link to the left to go to the park's main internet page to access park information not related to park planning (for example, park brochures, lodging and campground reservations, and general park information).

Project Title Document Title Review End Project Type
Develop a Comprehensive Site Plan for Warner Valley Warner Valley Comprehensive Site Plan Draft Environmental Impact Statement Nov 21, 2009 Implementation Plan - Other
Lassen Volcanic National Park Proposes Reservations for Stock Corrals on Recreation.gov and a New Flat Rate Fee Stock Corrals table Sep 26, 2011 Fee Collection
Replace Utility System At Headquarters to Eliminate Hazardous Conditions Environmental Assessment for Utilities Replacement Project at Lassen Volcanic National Park May 03, 2012 Capital Improvement/New Construction
Proposed Fee Rates Increase to Align with NPS Standard Pricing Model Public Comment Needed for Proposed Fee Increase at Lassen Volcanic National Park Jul 31, 2017 Fee Collection
EE/CA and Removal Action for Former Firing Range 2019 LAVO Engineering Evaluation/Cost Analysis Oct 04, 2017 Engineering/Technical Services
Bumpass Hell Trail and Boardwalk Rehabilitation Bumpass Hell Trail Visitor Use Improvements Environmental Assessment Apr 07, 2018 Repair/Rehabilitation
Lassen Volcanic Wilderness and Backcountry Stewardship Plan 2014 Wilderness and Backcountry Stewardship Plan Alternatives May 26, 2018 Wilderness Plan
Replace Drakesbad Leach Field Replace Failing Septic System for Drakesbad Guest Ranch Apr 11, 2019 Capital Improvement/New Construction
Replace Drakesbad Leach Field Replace Drakesbad Wastewater Disposal Field May 31, 2019 Capital Improvement/New Construction
Implementation of Dual Park Pass for LAVO and WHIS 2019 Proposed Implementation of Dual Park Pass for Lassen Volcanic National Park and Whiskeytown National Recreation Area Oct 19, 2019 Fee Collection
Accessibility Self Evaluation and Transition Plan, Lassen Volcanic National Park 2021 LAVO Draft Accessibility Self Evaluation and Transition Plan Apr 15, 2021 Other Plan
Improve Water Supply at Lost Creek Campground and Volcano Adventure Camp Lost Creek Campground and Volcano Adventure Camp Water Well Jun 19, 2022 Repair/Rehabilitation
Manzanita Lake Design Concept Plan LAVO DCP Manzanita Lake Developed Area Newsletter (Summer 2022) Sep 26, 2022 Development Concept Plan/Site Plan
Convert Wilderness Permits to an Online Reservation System Lassen Volcanic Proposes Online Wilderness Permitting Sep 30, 2022 Fee Collection
Manzanita Lake Design Concept Plan Manzanita Lake Design Concept Plan/Environmental Assessment Jul 01, 2024 Development Concept Plan/Site Plan
Improve Water Supply at Lost Creek Campground and Volcano Adventure Camp Comments Sought on Project to Improve Water Supply at Two Campgrounds Repair/Rehabilitation
Replace Drakesbad Leach Field Replace Drakesbad Wastewater Field FONSI Capital Improvement/New Construction
EE/CA and Removal Action for Former Firing Range 2019 Approval for CERCLA Non-Time-Critical Removal Action, Firing Range, Lassen Volcanic National Park Engineering/Technical Services
Bumpass Hell Trail and Boardwalk Rehabilitation Bumpass Hell Visitor Use Improvements FONSI Repair/Rehabilitation
Kings Creek, Sunflower Flat, Cold Springs Water Rights Documents for Kings Creek, Sunflower Flat and Colds Springs Water Right Easement Other
Replace Utility System At Headquarters to Eliminate Hazardous Conditions Finding of No Significant Impact (FONSI) for Mineral Headquarters Utilities Replacement Capital Improvement/New Construction
Improve Water Supply at Lost Creek Campground and Volcano Adventure Camp FONSI-Improve Water Supply at Lost Creek Campground and Volcano Adventure Camp Repair/Rehabilitation
Develop a Comprehensive Site Plan for Warner Valley Warner Valley Comprehensive Site Plan Final Environmental Impact Statement Implementation Plan - Other
Replace Utility System At Headquarters to Eliminate Hazardous Conditions Errata for Mineral Headquarters Utilities Replacement Environmental Assessment Capital Improvement/New Construction
Develop a Comprehensive Site Plan for Warner Valley Warner Valley Comprehensive Site Plan Record of Decision Implementation Plan - Other
* Open for comment.