Construct Yampa District Multi-Operations Facility
Dinosaur National Monument » Construct Yampa District Multi-Operations Facility » Document List
The prior support building was condemned primarily due to shifting sub-surfaces and failures of supporting walls. There is a nearby temporal stream drainage, that may have impacted foundation movement and wall failure. The old building was constructed in 1963, and requires asbestos abatement before demolition can begin. The new building must not be built on the same shifting ground where the old building was situated.
The new building will require intensive geotechnical surveying to locate the best location and ensure a solid foundation. This is most likely possible to the east of the current building, where tilted solid rock formations can be anchored into. To clear the space for construction, the non-functioning gas & diesel fuel system will need demolished and soil remediation work completed. The compound's site drainage must be improved and stormwater detention tanks need to be included to avoid potential pollution of the nearby stream bed. A new wash station for fleet and rafts will be built near the new building with an oil/water separator system. Underground utilities will be replaced and improved. All surfaces will be repaved and re-striped. The compound's security fence and gates will be replaced as well.
The new building will be a 11,750 SF single-story structure with an incident command center and training facilities. Improved restroom facilities will be needed to meet all program needs. Wildland fire program will have high ceiling bays for their fire engines, as well as equipment caches and offices. Law Enforcement will have offices in the new building, Search and Rescue cache, and will share fitness facilities with wildland fire, necessitating locker rooms. River Program will have high ceiling bays and a pully system for raft storage, as well as offices and river trip preparation facilities. Interpretation will have additional storage for visitor materials. Resource Stewardship & Science will have offices and a laboratory area that will include animal storage freezers and climate controlled herbarium storage. Maintenance program will have offices, a welding shop, and carpentry shop with necessary ventilation systems. The new building will also include a photovoltaic system on the roof, as well as rooftop mounted HVAC systems. Nearby a back-up generator building and propane storage tank will be constructed to serve the building. All components will be energy saving to LEED standards, and a fire/intrusion alarm system, along with fire suppression system, will be throughout the building. Construction shall be ABAAS compliant. Cosmetic design of the exterior will model the Mission 66 architecture of the building that it is replacing.
The existing Mechanic Shop (constructed as a "temporary" alternative in 2014) will be able to expand to previous capacity once the River Program moves to into the new Multi-Operations Support Building. This existing building will have exhaust systems installed, as well as the mechanic lifts replaced, and the installation of a fire/intruder alarm system.